One day,
one terminal

Around eighty percent of global trade by volume goes by sea. Scroll to follow one box through a single day at a container terminal, from first light to the next.

Dawn · pre-allocation

Before the first lift

Before the first light reaches the quay, the terminal has already planned where this box should be by midnight.

Morning · quay work

One box, one crane

A quay crane reaches over the ship, locks onto the box, and sets it down on a waiting yard tractor.

Midday · gate

Waiting is part of the plan

At midday trucks come and go through the gate, while inside the fence the box quietly waits its turn.

Evening · yard

Where the plan wants it

At evening a yard gantry sets the box where the loading plan wants it, so the night shift finds it.

Night · quay crane

The lamps come on

Night work begins as the lamps come on row by row, and the crane keeps lifting beneath their light.

Pre-dawn · handover

Handoffs built to hold

When every handoff along the day is built to hold, a whole terminal can work as one continuous movement.

The whole day

One day, one terminal

It was never six separate stops, only one day.